 | | REGULATORY DEVELOPMENTS |
August 2007
|
To read this entire item of approximately 2400 words online now in PDF format:
Click here to read this item if you are an existing subscriber to this publication.
Click here to purchase the full text of this item to read now (price: $25).
To subscribe to this publication and immediately access all its archives including this item, select the relevant publication under 'Catalogue' in the left-hand column
PLEASE NOTE: to read PDFs on www.argento.com you must be using Version 5 of Acrobat Reader or Adobe Reader. If you have an earlier version you can download the latest free of charge by clicking here
|
Washington State Pollution Control Hearings Board Rejects Vegetation Removal as Mitigation for Groundwater Rights
CPM Development Corp. dba ICON Materials v. Ecology
After a lengthy battle over the Department of Ecology’s denial of two groundwater permit applications for a gravel mining operation near Seattle, Washington, the Pollution Control Hearings Board (PCHB) issued a declaratory ruling that vegetation removal does not qualify as a “resource management technique” offsetting the impact of the water withdrawals. The PCHB’s ruling foreclosed the mine operator’s reliance on a 1997 statute requiring consideration of water impoundments, aquifer recharge, and similar resource management techniques as mitigation for water rights.
The information contained on this page is presented for your convenience as news and analysis. It is not intended as legal advice, nor should it be relied upon as such. Please consult an attorney for advice in your case or matter
|
Read related items on:
Topics) Mining and Geology) Water Quality
Topics) Water Quality) Administration
Topics) Water Rights) Administration
Topics) Water Rights) Change Applications
Topics) Water Rights) Groundwater
Washington) Seattle
Washington Pollution Control Hearings Board
Washington State Department of Ecology
CPM Development Corp, dba ICON Materials v. Washington State Depaartment of Ecology
|